Call / WhatsApp: +86 138 2359 1086 Email: chenyuanwu@mqwonderfun.com Wonderfun by NWAN | Worldwide B2B Supply

Corporate Apparel Programs

One-Piece Samples review fit, fabric and finish first
Small Batches program discussions from 100 pieces
Logo Application embroidery, printing, transfer and labels
US / EU Sizing men, women, unisex and kids options
7-15 Day Samples 30-45 day bulk production is typical

End-to-End Corporate Apparel Solutions

We help buyers structure uniform and branded apparel programs for the United States, Canada, Europe and the Middle East, from brief review and sample alignment through production planning and shipment coordination.

Uniform Program Consultation

Confirm category, quantity, destination, size range and timing goals

Custom Design & Development

Review logo method, Pantone direction, trims, labels and packaging

Sample & Fit Evaluation

Typical samples take 7-15 days depending on product complexity

Bulk Production & Quality Control

Material, measurement, logo and packaging checks before shipment

Shipment Coordination

Samples usually move by courier; bulk orders usually move by sea

After-Sales Service & Reorders

Quality issues are handled through replacement or remake discussion

Our Corporate Apparel Categories

Corporate apparel customization materials, embroidery, labels, buttons, color swatches and packaging

Make Your Brand Stand Out

  • Logo Embroidery
  • Screen Printing
  • Heat Transfer
  • Woven Labels
  • Hang Tags
  • Packaging Stickers
  • Custom Packaging
  • Pantone Color Matching
  • US / EU Size Matrix
  • Men / Women Fit
  • Kids Sizing
  • Private Labeling

For apparel programs, custom Pantone colors are generally planned from 1,000 pieces and confirmed by fabric, color and schedule.

Frequently Asked Questions

What is your minimum order quantity (MOQ)?

Samples can start from one piece for review. Small-batch discussions usually start from 100 pieces, while custom Pantone apparel colors are generally planned from 1,000 pieces.

How long does sampling take?

Typical sampling takes 7-15 days depending on product complexity, artwork, fabric, sizing, trims and packaging requirements.

What is your production lead time?

Typical bulk production takes 30-45 days after sample or specification approval, depending on category, order size, customization and material availability.

What logo and private-label options are available?

Logo embroidery, screen printing, heat transfer, woven labels, hang tags, packaging stickers and custom packaging can be coordinated by project.

How do you ensure product quality?

We use fabric checks, measurement checks, logo checks and packaging checks before shipment. Quality issues are handled through replacement or remake discussion.

Let's Build Your Corporate Apparel Program

Share your requirements and our team will get back to you within 24 hours.

  • chenyuanwu@mqwonderfun.com
  • +86 138 2359 1086
  • www.nwanmq.com
  • Shenzhen, China

Wonderfun by NWAN B2B Desk

Request catalog or sample review

Tell us the channel, target item and packaging direction you are reviewing. We can reply with a short catalog and sample options without assuming MOQ, lead time or compliance details before confirmation.

Common sourcing questions

Wonderfun by NWAN supports custom corporate apparel programs including polos, T-shirts, shirts, caps and branded staff apparel with logo application, Pantone color planning, US/EU size matrices, packaging and reorder support.

Can Wonderfun by NWAN customize polos and T-shirts with logos?

Yes. Logo embroidery, screen printing, heat transfer, woven labels, hang tags, packaging stickers and private-label coordination can be discussed after garment type and quantity are clear.

Can one apparel product include multiple colors and sizes?

Yes. A product program can be planned around a color and size matrix instead of creating a separate page for every small variation.

What MOQ and lead time should buyers expect?

Samples can start from one piece for review. Small-batch discussions usually start from 100 pieces. Typical sampling takes 7-15 days and bulk production is commonly 30-45 days after approval.

Scroll to Top
العربية